Exposed steel trusses on the 4th floorEast-facing skylight view from the 3rd floorWest-facing skylight view from the 3rd floor
May 2016
Marston Hall 4th floor skylight
December 2015
Open stair wellExterior construction elevator moves workers and materials to upper levelsOffice walls are going up on the 4th floorNew concrete floorsSteel columns matching the unique design of the Marston Water Tower columns were revealed after brick removal.Previously the tunnel to access the mechanical room located under the rotunda, this is now the new chilled water supply and return entrance to the building. The pipes shown connect to the campus chilled water system.